User pain points
The existing municipal power capacity is insufficient to meet the electricity load demand.
Applying for capacity expansion from the power company is difficult and the process is complex, making coordination and implementation challenging. Frequent power outages disrupt production.
Final result
Without expanding the mains power capacity or upgrading the power grid, ensure the stable operation of on-site equipment at full load; guarantee continuous and stable production, and eliminate losses due to power outages; electricity costs can be as low as 132 MNT/kWh.
Final result
The system adopts a multi-energy complementary mode, with photovoltaic power as the main power source, grid power as a backup power source, and diesel generators as a cold backup power source. Relying on the power support and regulation capabilities of the microgrid energy storage system, it not only completely solves the problem of insufficient grid power capacity, but also provides a stable supply of electricity for production.