Automatic transfer switching equipment

The system is equipped with a high-precision, high-response-speed static transfer switch, featuring millisecond-level seamless switching technology.

Energy Management System

The system is equipped with an AI-algorithm-based Energy Management System (EMS) that performs automatic scheduling behind the scenes using optimal strategies.

Liquid cooling system

Liquid is delivered precisely via direct piping, driven primarily by pump circulation, resulting in a power consumption reduction of 30% to 50% compared to traditional air cooling.

Rapid deployment

The civil engineering phase for traditional PV booster stations typically spans 3 to 6 weeks; in contrast, prefabricated PV grid-connection cabins utilize a factory prefabrication model, reducing the construction cycle by over 80% compared to traditional methods.